Production hall 7.600 m2, covered in manipulation area 1.400 m2, social and administrative background 1.000 m2, hard surfaces 7.800 m2, total area extent 21.000 m2.
Steel hall with thermal insulated sheathing of polyurethane panels, roof with PVC foil, saddle sky-lights turned to the north. Manipulation area, covered in by trapeze sheet with treatment against condensate. Administrative annex brick building with separated office rooms and social background. Outside asphalt hard surfaces.